GTD Calendar — a Joplin plugin
Your notes and to-dos, on a calendar, inside a note.
GTD Calendar renders day, week, and month calendars in any Joplin note — populated not by hand-maintained YAML, but by the actual notes and to-dos in the surrounding folder. Click an event and it opens the note. Items without a date collect in an Unscheduled bucket below the calendar, GTD-style.
How it works
Put a gtd-calendar fenced code block in a note. That note becomes a calendar of the notes and to-dos around it:
```gtd-calendar
view: month-grid
title: GTD Calendar
todos: all
```
Notes and to-dos opt in to the calendar with a gtd fenced code block — even an empty one. The block can also set a date (for plain notes), colours, an icon, and hover text:
```gtd
date: 2026-06-19
fg-colour: red
text: Seen on hover
```
To-dos don't need any of that for scheduling — their normal Joplin due date places them on the calendar automatically (when admitted by your todos: setting):
Installation
Search for GTD Calendar in Tools → Options → Plugins (desktop).
Requires Joplin 2.7+ on desktop.
The gtd-calendar block
Goes in the note that should display the calendar. All options are optional.
| Option | Values | Default | What it does |
|---|---|---|---|
view |
day, week, month, month-grid |
day |
day/week/month (or d/w/m) render a compact tile strip spanning all events. month-grid (or grid) renders the entire current calendar month as a classic 7-column grid with weekday headers. |
title |
text | — | Heading above the calendar. |
scope |
this-folder, children, a number, or all |
this-folder |
Which folders to scan: just this one, all descendants, or n levels down (scope: 2). Broad scopes scan every note body in the tree — fine for normal folders, worth knowing for huge ones. scope: all scans every notebook in your entire profile — powerful for a global dashboard, but potentially slow on large profiles; a footnote reports how much was scanned, and a ⚠ appears past ~2000 notes. notebook: is ignored under scope: all. |
notebook |
notebook name, Parent/Child path, or folder id |
this note's folder | Root the scan at a specific notebook instead of the one holding this note — even one in a different tree. scope then applies relative to it. A bare name must be unique; if several notebooks share it, qualify with a path (Work/Archive). Unknown/ambiguous → ⚠ warning + falls back to this note's folder. |
notes |
gtd-only, all, none |
gtd-only |
Which plain notes appear: only those with a gtd block, every note in scope, or none. |
todos |
gtd-only, all, none |
gtd-only |
Same, for to-dos. todos: all is handy — every to-do with a due date lands on the calendar with zero markup. |
sort |
asc, desc |
asc |
Order of events within each day/week/month and in Unscheduled. The timeline itself is always chronological. |
sort-type |
title, modified_date |
title |
What sort sorts by. |
Invalid values fall back to defaults and show a ⚠ warning above the calendar.
The gtd block
Goes in any note or to-do that should participate in calendar, kanban, or matrix views. An empty block is valid—it is the minimal opt-in. All properties are optional:
| Property | Example | What it does |
|---|---|---|
date |
2026-07-04 |
Schedules the item (yyyy-mm-dd or mm-dd-yyyy). Required for plain notes to appear in the grid; for to-dos it overrides the Joplin due date. |
bg-colour |
teal, #264653 |
Tile/chip background. Any CSS colour. (bgColor also accepted.) Without it, the item gets a stable pastel derived from its note ID. |
fg-colour |
white |
Tile/chip text colour. |
icon |
🦴 |
Shown on the tile/chip instead of the first two characters of the title. |
title |
Launch day |
Replaces the note's title on the calendar only. |
text |
Seen on hover |
Detail line in the hover card / tooltip. |
Where do dates come from?
- A
date:in thegtdblock always wins. - Otherwise, a to-do uses its Joplin due date.
- No date at all → the item appears in the Unscheduled section below the calendar: your dateless next-actions, always in view, one click from their notes.
To-dos keep being real Joplin to-dos throughout — due dates still sort, alarm, and sync exactly as before. Completed to-dos render checked and struck through.
Repeating to-dos
GTD Calendar plays nicely with the Repeating To-Dos plugin (v2). Install it, set a to-do to repeat (e.g. every Tuesday), and that to-do appears on the calendar at its next due date like any other — no extra setup. Recurring to-dos are marked with a ↻ symbol so you can tell them apart at a glance.
Because that plugin keeps a recurring to-do as a single item at its next due date, the calendar shows the next occurrence rather than every future one. Recurrence is detected via the recurring tag the plugin maintains; if you use a different recurrence tool that tags its to-dos recurring, the ↻ will appear for those too.
Kanban board
Alongside calendars, GTD Calendar can render a kanban board from your to-dos and opted-in notes. Add a gtd-kanban block — on its own, or stacked beneath a calendar in the same dashboard note:
```gtd-kanban
title: Editorial Board
scope: this-folder
todos: all
sort-type: due-date
in-progress-tag: in-progress
done-tag: done
card-detail: hover
page-size: 10
done-window: 7
```
Ordinary notes opt in by containing a gtd block—the same block used by the
calendar. An empty block is valid. For example:
```gtd
title: Research brief
date: 2026-08-15
text: Supporting material for the next review
```
The board has three columns:
- Backlog — every eligible ordinary note or incomplete to-do without the in-progress tag.
- In Progress — eligible notes and incomplete to-dos carrying the
in-progress tag (default
in-progress; configurable). - Done — opted-in ordinary notes carrying the configured done tag, plus
completed to-dos within
done-windowdays (default 7; setallfor full to-do history).
Completion always wins over the in-progress tag. Ordinary notes use done;
native to-dos remain governed by native Joplin completion. Completed notes are
not filtered by done-window because they have no completion timestamp. The
todos: option still controls only to-dos.
| Option | Values | Default | Description |
|---|---|---|---|
title |
text | — | Heading above the board. |
scope |
this-folder, children, integer, all |
this-folder |
Same folder-scanning rules as the calendar, including all (every notebook — see the calendar table's caution). |
notebook |
notebook name, Parent/Child path, or folder id |
this note's folder | Root the scan at a specific notebook (see the calendar table for the full resolution rules). scope applies relative to it. |
group |
notebook |
— | With the literal scope: children, render a separate board for the root notebook and every non-empty descendant instead of one aggregated board. Other scope forms warn and remain aggregated. |
notes |
all, none |
all |
Which project notes appear. all means every ordinary note in scope that explicitly opts in with a gtd block; it never includes plain notes without that block. |
todos |
gtd-only, all, none |
gtd-only |
Which to-dos appear. gtd-only requires a gtd block; all includes every to-do in scope; none excludes all to-dos. This option does not affect opted-in ordinary notes. |
sort-type |
due-date, title, modified-date |
due-date |
Order of cards within each column. Under due-date, cards with no due date sort last. |
sort |
asc, desc |
asc |
Sort direction. |
in-progress-tag |
text | in-progress |
The tag that places an eligible note or incomplete to-do in the In Progress column. |
done-tag |
text | done |
Marks an opted-in ordinary note complete. Done takes priority over in-progress-tag; native to-dos still use Joplin completion. |
card-detail |
hover, always, none |
hover |
Whether each card's due date / hover text shows on hover, always, or never. |
page-size |
positive integer | 10 |
Cards initially shown in each column and revealed by each List more click. Invalid values warn and fall back to 10. |
done-window |
integer or all |
7 |
How many days back the Done column reaches. |
Use the two independent type filters to build focused views:
# Projects only
notes: all
todos: none
# Tasks only
notes: none
todos: all
# Projects and tasks
notes: all
todos: all
Omitting notes preserves existing behavior (notes: all). Project notes still
require a gtd block and continue through the normal Backlog, In Progress, and
Done rules. notes: none filters them before warnings, tags, totals, grouping,
sorting, and pagination.
Each column applies page-size independently after filtering and sorting. When a column has more cards, List more reveals the next batch; hovering over it or focusing it with the keyboard shows exactly how many entries remain. Expansion lasts only in the current rendered view and resets when the note is reloaded. Column headings and board statistics always show full totals.
Separate views for child notebooks
Kanban and matrix blocks can split a notebook tree into complete per-notebook
views. Use the literal scope: children together with group: notebook:
```gtd-kanban
title: Project boards
notebook: Projects
scope: children
group: notebook
todos: all
page-size: 10
```
For this tree:
Projects
├── Home
│ ├── Archive (empty)
│ └── Repairs
└── Work
└── Release
the block renders a separate three-column board for cards owned directly by
Projects, Projects/Home, Projects/Home/Repairs, Projects/Work, and
Projects/Work/Release. Projects/Home/Archive is omitted when it has no
eligible cards. An empty parent is also omitted without hiding a non-empty
grandchild.
Cards are never rolled up into ancestor views: every eligible note or to-do
appears exactly once under the full path of its owning notebook. Full paths also
distinguish duplicate notebook names. Views are ordered root-first, then
depth-first with siblings sorted by title. Each generated column or quadrant has
its own page-size and List more state, and reloading resets all of them.
Malformed-item warnings appear beside their owning notebook view; scan and card
statistics appear once for the overall block.
The same options and ownership rules apply to gtd-matrix; every non-empty
notebook receives a complete four-quadrant matrix in the selected mode. Opted-in
ordinary notes group by their owning notebook exactly like to-dos.
Grouping is deliberately limited to the exact combination above. Plain
scope: children remains one aggregated view. this-folder, numeric depths,
and scope: all also remain aggregated; combining any of them with
group: notebook shows a warning and disables grouping.
Cards are compact and click through to their source note. To-dos use checkbox glyphs and may show recurrence ↻; ordinary notes use 📄 and never become recurring. Completed notes keep 📄 and use completed title styling. A custom icon overrides the fallback glyph. Note dates come only from the gtd block; to-do dates use the block first, then the native due date. Empty blocks opt in with defaults, while malformed blocks remain visible with fallback values and a warning. The board is read-only and never changes tags or completion. (Drag-and-drop is planned.)
The Matrix (Skeleton & Eisenhower)
A third view: a 2×2 prioritisation matrix for incomplete to-dos and ordinary notes containing a gtd block. Add a gtd-matrix block anywhere:
```gtd-matrix
title: Priorities
todos: all
mode: skeleton
page-size: 8
done-tag: done
```
Ordinary notes use the same explicit opt-in as kanban. For example, this note has a matrix date without becoming a to-do:
```gtd
date: 2026-08-15
text: Review before the planning meeting
```
Two modes:
mode: skeleton (default) — the Skeleton Matrix
Built to complement the kanban and calendar, using the tags and dates you already maintain. Rows ask am I on this? (the in-progress tag); columns ask is the clock running? (due within urgent-window days — overdue counts — or carrying the urgent tag as a manual override):
| Due soon | Not due soon | |
|---|---|---|
| Active | Do Next | Scheduled |
| Not active | On Deck | Backlog |
On Deck is the quadrant to watch: due soon, not yet started. Nothing is ever labelled "Eliminate" — a Backlog item is simply low priority, not condemned. Dateless in-progress work sits in Scheduled (active, no clock). Eligible ordinary notes use their gtd date and the same tag rules; completed to-dos and notes carrying done-tag do not appear at all.
mode: eisenhower — the classic
Quadrants from the urgent/important tags: Do First (both), Schedule (important), Delegate (urgent), Eliminate (neither).
Options
| Option | Values | Default | Description |
|---|---|---|---|
mode |
skeleton, eisenhower |
skeleton |
Which matrix semantics to use. |
title |
text | — | Heading above the matrix. |
scope |
this-folder, children, integer, all |
this-folder |
Same folder-scanning rules as the calendar and kanban, including all (every notebook — see the calendar table's caution). |
notebook |
notebook name, Parent/Child path, or folder id |
this note's folder | Root the scan at a specific notebook (see the calendar table for the full resolution rules). scope applies relative to it. |
group |
notebook |
— | With the literal scope: children, render a separate complete matrix for the root notebook and every non-empty descendant. Other scope forms warn and remain aggregated. |
notes |
all, none |
all |
Which project notes appear. all includes only ordinary notes explicitly opted in with a gtd block; none produces a task-only matrix. |
todos |
gtd-only, all, none |
gtd-only |
Which to-dos appear. This option does not affect ordinary notes, which appear only when they contain a gtd block. |
sort-type |
due-date, title, modified-date |
due-date |
Order within each quadrant; dateless cards sort last under due-date. |
sort |
asc, desc |
asc |
Sort direction. |
urgent-tag |
any tag name | urgent |
Eisenhower's urgent axis; the Skeleton mode's manual due-soon override. |
important-tag |
any tag name | important |
Eisenhower's important axis (unused in Skeleton mode). |
in-progress-tag |
any tag name | in-progress |
Skeleton mode's active row — same tag as the kanban's In Progress column. |
urgent-window |
integer (days) | 3 |
Skeleton mode: how close a due date must be to count as "due soon". |
card-detail |
hover, always, none |
hover |
Card detail line behaviour, as on the kanban. |
page-size |
positive integer | 10 |
Cards initially shown in each quadrant and revealed by each List more click. Invalid values warn and fall back to 10. |
Each quadrant expands independently in page-size batches. The List more hover/focus popup reports the number still hidden, and reloading the note resets all expanded quadrants. Quadrant headings and matrix statistics continue to show full totals.
Cards behave like kanban cards: compact, clickable, and read-only. Ordinary notes use the same gtd title/date/colour/icon/text overrides, use 📄 when no icon is set, and never show completion or recurrence styling. Empty and malformed blocks follow the same opt-in and warning behavior as on kanban.
Gantt chart
A timeline of projects built from items across your notes. Unlike the other views, gantt items opt in with their own ```gtd-gantt block (not the gtd block), and every item declares a project: — that's what groups items into swimlanes.
The same fence name does two jobs:
- A
```gtd-ganttblock with aproject:key is an item declaration. It renders in place as a small inline badge (gantt: <project>), and the item appears on any gantt chart that scans it. - A
```gtd-ganttblock without aproject:key is the chart itself.
Item blocks
Put one in any note or to-do you want on the timeline:
```gtd-gantt
project: bluesky
begin-date: 2026-07-01 # notes only — the bar's span
end-date: 2026-07-14
bg-colour: teal # optional, same styling keys as the gtd block
fg-colour: white
title: Design phase # optional; defaults to the note title
text: Hover detail # optional
```
- Notes become bars — a span from
begin-datetoend-date. Both are required and must be valid, withend-dateon or afterbegin-date; otherwise the item is excluded with a ⚠ warning. - To-dos become milestones — a ◆ marker on the to-do's native due date.
begin-date/end-dateon a to-do are ignored (with a warning). A to-do with no due date is excluded with a warning. Completed milestones render dimmed and struck through; recurring to-dos get a ↻. - Dates accept
yyyy-mm-dd(andmm-dd-yyyy), same as everywhere else.
There is no "Unscheduled" section — an item with no usable date simply doesn't appear (the warning tells you why).
Chart block
Put this where you want the timeline drawn:
```gtd-gantt
title: Roadmap
scope: children # this-folder | children | N | all
filter-project: bluesky # optional — limit the chart to one project
```
| Option | Values | Default | What it does |
|---|---|---|---|
title |
text | — | Heading above the chart. |
scope |
this-folder, children, a number, or all |
this-folder |
Same folder-scanning rules as every other view. |
notebook |
notebook name, Parent/Child path, or folder id |
this note's folder | Root the scan at a specific notebook (see the calendar table). Ignored under scope: all. |
filter-project |
project name | — | Limit the chart to a single project (case-insensitive). |
sort-type |
begin-date, title, modified-date |
begin-date |
Row order within each project. |
sort |
asc, desc |
asc |
Sort direction. |
card-detail |
hover, always, none |
hover |
none suppresses the hover tooltip on bars/milestones. |
Note there is no notes/todos option — items opt in via their project: block, so those keys aren't used (and warn as unknown if set). Projects are shown alphabetically; the chart draws a month tick header, a red "today" line when today falls in range, and scrolls horizontally for wide ranges. Bars and milestones are clickable — they open the source note. Read-only.
Drilldown
Everything is clickable: single-event tiles, every row of a multi-event hover card, every chip in the month grid, every Unscheduled chip. Clicking opens the source note.
Limitations
- Desktop only. See the note below.
month-gridalways shows the current month; there is no month navigation yet.- The calendar refreshes when the note re-renders (e.g. switching notes); edits to other notes don't live-update an open calendar.
Mobile / Android
This plugin is built for Joplin desktop and is not expected to work on the Android or iOS apps. It depends on rendering custom code blocks in the note viewer and on two-way messaging between that view and the plugin — capabilities Joplin's mobile apps have historically not supported, or supported only partially. On mobile, a gtd-calendar block will most likely render as plain text or not at all, and drilldown won't work. The companion Repeating To-Dos plugin is desktop-only as well.
Your data is unaffected, though: the calendar is only a view. Your to-dos and their due dates are ordinary Joplin items that sync to mobile normally and appear in Joplin's built-in to-do list and search, with alarms intact — you just won't see the calendar rendering there. If you want a quick scheduled-items view on mobile, pair the calendar with Joplin's native to-do view or the Embed Search plugin on desktop.
Bugs & feedback
Issues and ideas: the repository, or find me on the Joplin forum.
Development
npm install
npm test # 251 unit tests
npm run dist # builds publish/*.jpl
Design notes and the full specification live in SPEC.md. Release history is in CHANGELOG.md.
Cutting a release
- Bump
versioninsrc/manifest.json,package.json, andpackage-lock.json(the manifest and package versions must match). - Add an entry to
CHANGELOG.md. npm publish(thepreparescript rebuilds the.jplfresh from source, so you can't accidentally publish a stale build).
If npm publish fails with E404 on the PUT, check npm whoami first — a 401 there means your login session has expired, which npm surfaces as a misleading 404 on publish. Fix with npm login --auth-type=legacy, or avoid it entirely with a granular access token so publishing never needs an interactive session.
Credits & license
A fork of Event Calendar by Franco Speziali (WeMakeMachines), whose tile-strip design this plugin proudly keeps. Forked with gratitude under the MIT license; this plugin is MIT as well.
Made by Victor Wiebe. Creative work for an uncaring world.



